AUGUST
The Helpdesk's team carried out the installation of CCTV cameras, POS terminals, and servers in the bakeries owned by “August”.
The VPN connection, as well as the FINA program, have been successfully set up among the branches. The Helpdesk Team is still providing IT outsourcing services on the network of August.
IC company
In IC Company Helpdesk's team implemented IP security camera systems.
Public register
Helpdesk's team set up more than 100 access point.
York Towers
Helpdesk's team installed security cameras in York Towers ensuring full coverage of 10 hectares. through the optical network, the Ring system was organized.
ANAGI
The Helpdesk's team conducted following projects in Anagi;
installation of CCTV systems, set up of optical and internet networks, arrangement of Domophone and Smart Homr systmes and Etc.
Ashley Home
Our team provided the successful installation of CCTV cameras and audio systems in the new showroom of Ashley Home in the City Mall Saburtalo.
The project fully meets modern and fire-fighting standards.
Rugby facility
Helpdesk's team set up and configure IP security camera systems.
Data Center Kutaisi
In 2016, a mining center was built in the Kutaisi Free Industrial Zone with a capacity of 25 MW.
The project included the arrangement of cable networks, 2 lines of optical internet, an alternative air internet line, switches, routers, and servers. Effective mechanisms of operational center work were installed and introduced in the building. In addition, our team worked on creating a monitoring system (process management, temperature maps, safety systems).
Even today, the Helpdesk team is working on IT support, monitoring, and management at the I-LAB Mining Center.
Mining Center Bifrox
The length of the project of Bifrox Mining Center included 20 days. During these 20 days, we, the Helpdesk team built and arranged a 20-megawatt cryptocurrency mining center.
The project works included network wiring, network security implementation, administration, and configuration. As well as, the implementation of the Data Center Management Monitoring Program, the creation of a temperature control interface, and the installation, and configuration of the mining devices.
Mining Center Bitfury
The Mining Center Bitfury is the first Center in Georgia for Mining Cryptocurrencies.
In 2014, the Helpdesk team became involved in the arrangement of the data center.
The project included planning and arrangement of cable networks, servers, switches, and wireless and optical networks. This network was arranged on 3600 units of devices.
Mining Center Tbilisi
The Helpdesk team is carrying out the following works in the Data Center for Mining Cryptocurrencies:
the arrangement of the internet network, the configuration of various types of mining equipment and network devices and routers, and the arrangement of CCTV cameras.